Hi
The 200 block of Lexington has Sonic Gigabit Fiber but not the 300 block. I spoke with a guy in the sonic truck when the 200 block was going in earlier this year and it sounded like the whole 3 block stretch was going in. Any news you can share with that?
PG&E replaced a telephone pole at the south end of Lexington ( corner with 21st ) last night - perhaps that has been holding up progress?
I know several neighbors on the block interested in signing up when it arrives. Hopefully soon.
Thanks
Peter
The 200 block of Lexington has Sonic Gigabit Fiber but not the 300 block. I spoke with a guy in the sonic truck when the 200 block was going in earlier this year and it sounded like the whole 3 block stretch was going in. Any news you can share with that?
PG&E replaced a telephone pole at the south end of Lexington ( corner with 21st ) last night - perhaps that has been holding up progress?
I know several neighbors on the block interested in signing up when it arrives. Hopefully soon.
Thanks
Peter