From page 5 in 2022, I wrote:
--------------
I'm in St Mary's Park but that's close enough to piggyback on this thread, right?
I believe that Sonic fiber is on Bosworth, east of San Jose Ave, and have recently have seen some technicians (unsure who they work for, but not the obvious Sonic labeled trucks) at the Mission/Bosworth-Murray intersection and at the ATT junction box on Murray where the old KFC used to be (have had some short loss of service issues since I've seen the technicians but connectivity comes back within 5 mins).
A few telephone poles have been replaced in the last two years years as well, so I know they can handle a new line.
Any chance of an update for the St. Mary's Park, a sub-neighborhood in the greater Bernal Heights neighborhood?
--------
And now I am here in Sept 2024.
About a month back I directly reached out to Sonic about an update and received a somewhat generic reply with a note about there not being overhead access ('telephone/power' poles) and SF not allowing microtrenching.
I replied back that the poles are in the back and sent a Google Streetview image clearing showing them.
Sonic thanked me for that information but little else was forthcoming.
Checking this thread today, there was a note about Mission Street crossing at 3798 Mission and something more about Sonic lines along Cresent St.
I am closer 4000 Mission (at Bosworth) where there is another Mission Steet crossing with a AT&T box on either side of Mission and I have seen Sonic trucks on the west (Bosworth) side and the new fiber lines are clearly up.
In the past 6 months, new poles have been installed in the St Marys Park (micro)neighborhood, so they should be able to handle new fiber lines.
So, if that is the case, and there is a Mission St crossing at Cresent, any idea when there would be a crossing at Bosworth (4000 Mission St)?
--------------
I'm in St Mary's Park but that's close enough to piggyback on this thread, right?
I believe that Sonic fiber is on Bosworth, east of San Jose Ave, and have recently have seen some technicians (unsure who they work for, but not the obvious Sonic labeled trucks) at the Mission/Bosworth-Murray intersection and at the ATT junction box on Murray where the old KFC used to be (have had some short loss of service issues since I've seen the technicians but connectivity comes back within 5 mins).
A few telephone poles have been replaced in the last two years years as well, so I know they can handle a new line.
Any chance of an update for the St. Mary's Park, a sub-neighborhood in the greater Bernal Heights neighborhood?
--------
And now I am here in Sept 2024.
About a month back I directly reached out to Sonic about an update and received a somewhat generic reply with a note about there not being overhead access ('telephone/power' poles) and SF not allowing microtrenching.
I replied back that the poles are in the back and sent a Google Streetview image clearing showing them.
Sonic thanked me for that information but little else was forthcoming.
Checking this thread today, there was a note about Mission Street crossing at 3798 Mission and something more about Sonic lines along Cresent St.
I am closer 4000 Mission (at Bosworth) where there is another Mission Steet crossing with a AT&T box on either side of Mission and I have seen Sonic trucks on the west (Bosworth) side and the new fiber lines are clearly up.
In the past 6 months, new poles have been installed in the St Marys Park (micro)neighborhood, so they should be able to handle new fiber lines.
So, if that is the case, and there is a Mission St crossing at Cresent, any idea when there would be a crossing at Bosworth (4000 Mission St)?